Hotel Café Royal

HOTEL CAFÉ ROYAL

Project: Hotel Café Royal
Category: Hotel
Where: London – UK
Line: System 900 Exclusive Range
Partner: Baz Associates

Opened in 1865 on Regent Street in the heart of London, Hotel Café Royalneeds no introduction. In the five-star luxury class and owned by The Set Hotels group, its guests have included two kings of England – Edward VIII and George VI, Oscar Wilde, Winston Churchill and music legends of the calibre of David Bowie, Mick Jagger and the Beatles and the actress Elizabeth Taylor.
There’s no question about the culinary range reaching the level of expectation of an extremely demanding clientele. From the restaurant of international chef Laurent Tourondel which bears his name to Cakes & Bubbles with the famous desserts prepared by the Michelin three-star chef Albert Adrià and the cocktails in Green Bar and Ziggy’s, as well as the traditional afternoon teas served in the historical Oscar Wilde Lounge.

The brief

  • Suzy Baz, founder and president of eminent consultancy Foodservice Baz Associates, was appointed to rethink the Hotel’s new F&B offering.
  • Baz had already worked with the company Alrov Luxury Hotels, owners of Café Royal, handling various projects in Europe and Israel. “We all knew it would be exciting”, she recalled as a comment on the first time she took part in the brainstorming phase for renovation of the hotel alongside architect and interior designer Piero Lissoni.
    The project, started up initially as a ‘simple’ redesigning of the main kitchen in the restaurant, soon became much more far-reaching to include also the creation of a new sushi bar planned together with chef Tourondel.
  • “The requests included in the brief were truly the most challenging I’d ever come across. The new equipment for the kitchen had to be innovative and designer and ensure reliability and top performances”, commented Baz.
  • No separation between back and front of the house for the kitchen. The two areas had to be thought out in parallel with a view to continuity. To do this Lissoni decided to opt for a colour choice coordinated with the colour of the kitchen, floors and extractor hoods.


The solution

  • Thanks to its high flexibility, reliability and design, Ambach was found to be the most suitable choice for meeting the needs of the Hotel Café Royal.
  • Baz was very familiar with Ambach kitchens after choosing them for the Conservatorium Hotel in Amsterdam, another client with very high demands in terms of quality and design and also part of The Set Hotels group.
  • For Café Royal Baz proposed a single unit with induction hob from the Ambach System 900 Exclusive Range line in stainless steel with black finishes. A salamander and under-top fridges are also an integral part of the kitchen.
  • The key distinctive feature of the kitchen remains however its design, fully custom-made in every detail such as, for example, the rounded corners. “It may seem like a minor detail but, in a project such as this, it’s the small details that make the difference”, claimed Baz. “Appearance and finishes are crucial in top-of-the-range open kitchens”.
  • The greatest challenge of this project was to remodel the kitchen while the hotel stayed open and fully operational. “It was essential that our guests were not disturbed by the work”, commented Ido Shitrit, project manager at the hotel.
  • “Times of access to the building were limited and rigid. We also had to adapt all the pre-existing heating, ventilation and air conditioning systems that had to remain”, explained Baz.
  • “The end result was great thanks to the excellent coordination and collaboration between all stakeholders, including also the dealer C&C Catering, involved right from the outset in the design work alongside the rest of the team”, commented Baz.
 

Saadiyat Rotana Resort

SAADIYAT ROTANA RESORT

Project : Saadiyat Rotana Resort 
Category : Hotel 
Where : Abu Dhabi – United Arab Emirates
Line : System 700, System 850, Chef 850
Partner : MCTS

Saadiyat Rotana Resort & Villas, which opened in April 2018, is one of Abu Dhabi’s most exclusive destinations.
With seven different F&B offerings, it can meet demand in every way.
Starting with Si Ristorante Italiano & Bar, which serves genuine Italian dishes in a casual yet elegant setting, then Hamilton’s Gastropub with its British and American-inspired cooking, Turtle Bay Bar & Grill with a grilled meat and fish menu, continuing with Sama Lobby Lounge for tea and coffee breaks and sweets, Pool Bar for aperitifs and snacks, Nasma Beachfront Bar for sushi and cocktails and finally the international restaurant Sim Sim, winner of the FACT Dining Award of Abu Dhabi thanks to its famous brunches.

The brief

  • As early as 2013, five years prior to opening, the consultancy MCTS was chosen to take part in the invitation to tender for development of the concept and design of all areas of Saadiyat Rotana.
  • The design stage lasted two years and, as well as the kitchens, involved the entire building with seven dining areas, three areas for banquets and events, a ballroom and a spectacular outside space used for events.
  • A main kitchen and an open one equipped with a series of workstations had to be planned for each area.


The solution

  • For such a wide-ranging project, Elenco, traditional food service partner of Saadiyat Rotana, immediately thought of Ambach with a view to made-to-measure kitchens with single hygiene tops for the open area and rugged and high-performance modular systems for back of house.
  • High-tech modular islands from the Ambach System 850 and Chef 850 lines were supplied for the kitchens, apart from the Pool Bar kitchen for which the more compact System 700 line was chosen.
  • “Arranging the equipment in a kitchen is essential to the success of a restaurant. If a mistake is made, you’re forced to work much more”, claimed Thijs van Rhoon, executive chef of the resort. The chef declared himself to be very pleased with the high quality and resistance of the equipment installed inside Si Ristorante Italiano & Bar.
  • This kitchen in the Italian restaurant was in fact the greatest challenge in this project. “In the Middle East there is a series of cultural and legal implications for the eating of pork, an aspect which necessarily has to be taken into account when separating the open kitchen from the one behind. This led to a series of discussions with local authorities and the work team to demonstrate the separation between handling of the product and the workflow”, commented Michael Chabowski, general manager of MCTS.
  • One of the key elements in the success of this project, according to Chabowski, was the ability of the team to work immediately in close contact in a spirit of utmost cooperation.
  • Ghassan Chbeir, Ambach sales director for the Middle East, declared himself to be in full agreement as regards the strength of the teamwork. “When one of the main businesses in the region, Rotana, a world leader consultancy such as MCTS and one of the best distributors of kitchens in the Middle East such as Elenco manage to work together effectively, there are no doubts as to the end result, which is absolutely extraordinary”, commented Chbeir.

ATLANTIS SANYA

ATLANTIS SANYA

Project : Atlantis Sanya
Category : Hotel 
Where : Hainan – China
Line : System 850
Partner : Angles n Curves & Ali China

Atlantis Sanya on Hainan is one of the largest resorts in the whole of China. Owned by the Chinese group FOSUN and managed by Kerzner International, which also controls the “older” Atlantis The Palm in Dubai, it is definitely unique of its kind.
Based on the theme of the lost city of Atlantis, its structure is in the shape of a sail and it holds 1,314 rooms, including five deluxe underwater suites, the Aquaventure water park with an Atlantis theme, one of the world’s largest open-air water parks, and 21 restaurants, including mainland China’s first Bread Street Kitchen and Bar by Gordon Ramsay, two places open all day and an underwater restaurant.

The brief:

  • In order to expand even further the already broad culinary range on offer the kitchen had to be remodelled. After ten years’ heavy use, even if with minimal maintenance and significant savings for the resort, the time had nevertheless come to replace the Ambach equipment.
  • “We wanted to create something innovative, with a wow factor, for all the open kitchens”, recalled Acker So, director of Angles + Curves, the consultancy which guided the design team. “Also, considering the running costs, prices of raw materials, costs of staff management and investments in equipment, we had to think about maximising productivity”, added So.
  • “A fundamental requirement to be taken into account when designing the kitchen was to make sure that guests could see the chefs work”, said David Laval. “There’s a lot of space in the kitchen and everything is correctly positioned, but the most important thing is the extraordinary experience to offer guests”. 


The solution

  • Given the success of past collaboration between Angles + Curves and Ali China, Ambach distributor in China, for projects such as those for Marriott, Hilton, IHG and Hyatt, it was immediately clear that the Alto Adige company was to play a key role also for Atlantis Sanya.
  • The Saffron All Day Dining restaurant has eight open kitchen workstations serving western and Asian dishes, prepared to order for each guest. It is equipped with two cooking islands from the System 850 series, one of which is the first Ambach grill workstation in China.
  • The biggest challenge was integrating western and oriental equipment within a single custom System 850 island. Thanks to collaboration between the Ambach design department and local suppliers the end result is a perfect mix of the two elements. 
  • The island includes a gas pasta cooker, a salamander, a coal grill, a Chinese wok and an electric plancha. 
  • “Just like in any project of this size we had to face various challenges, all of them overcome thanks to a perfect combination of patience, experience, teamwork and effective communication. The result is amazing”, concluded David Laval, who heads the accommodation facilities of Atlantis Sanya.
  • Close cooperation between client and consultancy was essential in order to achieve a top-level result. When Atlantis Sanya opened in the spring of 2018, it did so with the satisfaction of all the partners involved.

THE MERRION HOTEL

THE MERRION HOTEL

Project : The Merrion Hotel
Category : Hotel
Where : Dublin – Irland
Line : System 900
Partner : Kaneco

The Merrion Hotel has for many years been one of the best-loved luxury hotels in Dublin. Just a five minutes’ walk from the main cultural and entertainment attractions of the city, for over twenty years it has continued to welcome its guests in high-end spaces with exclusive design and first-rate service.

The hotel offers a vast range of dining choices, from the more informal options available at The Cellar Bar to the modern Irish cuisine of The Garden Room, and the more sophisticated dishes served by Patrick Guilbaud, Ireland’s only restaurant with 2 Michelin stars.

After extensive renovation work which ended in 2017, the already high quality standards of the hotel reached even loftier heights.

The brief

  • In order to best meet the production needs of the Garden Room restaurant it was necessary to remodel the kitchen with a highly versatile solution which would allow meals to be prepared throughout the day – breakfast, lunch and dinner, every day of the week and every day of the year. The production demands however still had to be matched by high quality. Each dish had to be prepared with always super-fresh ingredients and very great care taken with presentation.
  • Chef Ed Cooney also wanted to offer a work environment as comfortable as possible for his team, i.e. a cool and quiet kitchen without excess steam.


The solution

  • For Gerry Kane from the company Kaneco, kitchen contractor and longstanding partner of the Merrion, there was no doubt as to the choice of the company which was to build the kitchens: Ambach.
  • Together, Kane and Cooney opted for two cooking islands from the Ambach System 900 Exclusive Range, intended both for the bar menus and those of the Garden Room restaurant. Made to measure with a single hygiene top, both are designed with areas dedicated to the various phases of preparation. “Each area is ‘independent’ and equipped with an Ambach island, an oven and refrigeration and patisserie equipment”, explained Kane.
  • All this was designed to optimise work. For example, staff entering and exiting move in two different flows. In this way confusion, noise and the risk of breaking plates are considerably reduced. “The work space is now much quieter, easier to manage and cleaner”, commented Kane.
  • The kitchen control system also reduces the annual costs of running the air treatment and extractor system by 50%, a significant saving for a kitchen which works non-stop all year.
  • Difficulties did however arise during the works. “It was a bit like playing Tetris. We constantly had to move everything from one side to the other without closing down the hotel, not even for a day”, added Kane.
  • The greatest challenge came when Kaneco and Cooney had to totally redesign the layout of the kitchen as two large pillars ‘sprang up’ just where the cooking area was intended to be originally. “This forced us to optimise the space available by moving the kitchen by about 50 cm”, explained Kane.
  • After having completed the work on the Garden Room kitchen, the team moved on to the other kitchen at basement level. Here, despite the confined spaces, it was possible to allow access to the kitchen thanks to the Ambach system which enabled the island to be turned through 90°. All the equipment was reconfigured in the new position and a patisserie zone was also created.
  • Even if the Garden Room kitchen is very different compared to the original design, Cooney and his team expressed great satisfaction at the end result. “It’s a pleasure to work in the new kitchen. I’m pleased with the design as well as the ergonomics and the performances. The work environment at basement level has also really improved”, added Cooney. Judging by the crowd in the restaurant, customers too have not been slow in showing their appreciation, recognising the high added value for the hotel.

BOLLANTS SPA IM PARK

BOLLANTS
SPA IM PARK

Project : BollAnts – Spa im Park
Category : Hotel
Where : Bad Sobernheim, Rheinland-Pfalz – Germany
Line : System 850
Partner : Wirtz GmbH

BollAnts – Spa, housed in the Bad Sobernheim wellness centre, is considered to be one of the 20 best spa hotels in Germany. Furthermore it was here where, in the early 20th century, the famous Felke therapy was devised, a byword since then for a balanced style of living made up of a healthy diet and naturopathic treatments.
The hotel was built in 1907 by the great-grandfather of the family of owners, Bollant-Anton, and extends for 120,000 square metres divided up among accommodation facilities and private gardens, both designed to create a true haven of peace for guests.
The six private lodges allow you to restore wellbeing in solitude, while a large wellness centre, with indoor and outdoor swimming pools, relaxation treatments and medical treatments, contributes to total relaxation.

The dining options are served up in three different restaurants to satisfy every palate. They include the Jungborn restaurant, awarded a Michelin star and the undisputed reign of the two chefs Jens Fischer and Philipp Helzle, the gourmet restaurant Hermannshof for Mediterranean cuisine and the main restaurant inside the Villa in which only the hotel guests can enjoy the delicacies prepared by chef Jens Gilcher and sous-chef Fabian Schwan.

The requirement

  • Parallel to the renovation work on the Villa and the need to add 160 covers in the restaurant, it was found to be necessary to move and expand the kitchen.
  • The kitchen had to continue to function during the renovation, cooking for hotel guests, those residing in the private lodges, for dishes to be served in the Jungborn and Hermannshof restaurants and also the events catering service.
  • For this reason the owner of the Bollant Anton hotel and chef Jens Gilcher sought a small, compact cooking island, fitted out with innovative and high-performance equipment together with necessary work surfaces for preparation.
  • The owners opted for invaluable support from Jürgen Wirtz, CEO of the company Wirtz GmbH. who in turn recommended choosing Ambach, long-term partner of Wirtz for around 40 years.


The solution

  • A modular cooking island was therefore chosen from the Ambach System 850line, which immediately became the nerve centre of the new kitchen in the Villa. A small gem in back-to-back configuration, distinctive in its ruggedness and performance.
  • Preparation of the healthy dishes required two induction hobs on each side of the cooking island with a compound grill and pasta cooker. All the equipment was then integrated into a single hygienic surface for ease of cleaning.
  • Thanks to the H3 open lower base units an additional space was formed in the kitchen, very useful for arranging the cooking utensils.
  • Another innovative addition to the suite was engineered incoporating two panels hinged laterally on one side of the cooking island, a perfect solution for creating the necessary work surface and storage space, especially for large-scale catering for events.
  • Wirtz monitored the works throughout, from design to development and installation of the kitchen in the Villa.
  • Collaboration among all the partners was excellent. In fact the owners, chef and sous-chef declared themselves very pleased with the new Ambach System 850 cooking technology. “Arrangement of the equipment is outstanding as it allows us to work without stress and with maximum efficiency and speed of preparation. We were certain right from the start that Ambach was the right choice”, said Jens Gilcher.

GASTHAUS STEINBERG

GASTHAUS STEINBERG

Project : Gasthaus Steinberg
Category : Hotel & Restaurant
Where : Windautal / Westendorf – Austria
Line : System 700, System 850 & Chef 850
Partner : Gastro West Großküchen GmbH

The hotel Gasthaus Steinberg is in Windautal, a splendid location in Austria surrounded by the Alps of Kitzbühel. Against the backdrop of a landscape of woods and meadows alone, the hotel has represented a haven of peace and tranquillity for over 80 years, a place for recovering from the stress of daily living. The owner, Michael Grafl is also chef and president of KochArt, the association of Austrian restauranteurs known for their cuisine based on locally sourced, organic ingredients.
The hotel restaurant has as many as 200 covers (outdoors and indoors) and offers a mix of home cooking specialities and innovative dishes.

The brief

  • Grafl needed to remodel his kitchen and renovate it. “In recent years I’ve worked in an old and somewhat inconvenient kitchen”, he said. For this reason, I was looking for quality equipment which could last for many years”.
  • The new equipment had to be gas powered as the electrical energy produced independently by the building with solar panels was not sufficient for meeting its demands.
  • Another equally important aspect was the aesthetics of the kitchen, in which Michael Grafl hosts courses, events and seminars.


The solution

  • The new kitchen was installed at the same time as more extensive restructuring works were carried out on the entire building.
  • The now dated structure and the limited space in the kitchen forced the choice of a line which would adapt perfectly to the numerous structural restraints imposed.
  • The choice therefore fell on compact equipment and a corner of the island was bevelled to allow adequate passage through the kitchen.
  • For the kitchen island, alongside the partner Gastro West Großküchen, Grafl chose the Ambach System 700 and System 850 lines with hygienic single piece top and highly crafted design and details. For bulk cooking appliances such as the tilting bratt pan, the Chef 850 line was chosen as a guarantee of high performance and productivity.

MIRAMAR CLUB HOTEL

MIRAMAR CLUB HOTEL

Project : Miramar Club Hotel – HVD Hotels I The Blu Restaurant
Category : Four-Star Hotel
Where : Obzor – Bulgaria
Line : System 700
Partner : AVA-M Ltd

The Miramar Club Hotel is known as one of the finest hotel facilities in Bulgaria and is an integral part of the HVD Hotels – Hospitality Variety Dedication Group.

Overlooking the Black Sea, the hotel opened its doors to guests in 2006 offering a mix of relaxation, fun, and entertainment in the setting of a truly unique landscape.

To completely satisfy the needs of its guests, the hotel has created extensive culinary offerings through a vast choice of restaurants, including The Blu, serving Italian cuisine with an à la carte menu.
Located on the sixth floor of the hotel, the restaurant provides a magnificent terrace with breath-taking views of the Black Sea.

The requirement

  • The Hotel wanted to add to guests’ experiences during their stay by creating a destination restaurant.
  • The space available for creating the kitchen was small, confined, and irregular in shape. The equipment therefore had to be easily adaptable to the environment and, at the same time, extremely high performing in order to serve over 80 covers per day.
  • The time available for carrying out the work was decidedly limited. All the work had to be carried out in a few short months to be ready for the start of the summer season.


The solution

  • The space at the attic level on the sixth floor of the main building and the large adjacent terrace were used to create the restaurant space, the ideal setting for creating a restaurant with panoramic views.
  • To best meet the needs of the Hotel, Architects and Project Managers from the company AVA-M Ltd appointed for the project, chose the equipment Ambach System 700, the compact and high-performance line, ideal for medium-sized kitchens where space is at a premium. With its innovative features and cutting-edge design System 700 is the perfect solution for those who do not accept compromises between style, quality, flexibility, power and performance.
  • In order to equip The Blu kitchen, Ambach supplied a complete solution including: a double hob, a four hob, flat grill, pasta cookers, and gas fryers, H3 hygienic open base units with ad hoc design completed the design. The worktops were fitted with the exclusive Ambach “Seamless” joining system which combines the widest freedom of configuration of a modular kitchen with the highest standards of hygiene.
  • With such a well-organised kitchen, the restaurant can serve around 150 covers per day and offers an à la carte menu with 10 main dishes.
  • The work was completed in around five months. There were several challenges and critical factors faced including; delivery of the equipment by crane up to the sixth floor of the hotel and then assembly in situ.
  • AVA-M Ltd then completed the tests and commissioning on the equipment as well as providing staff training utilising their executive chef.

HOTEL ZENTLINDE

HOTEL ZENTLINDE

Project : Hotel Zentlinde
Category : Hotel & Restaurant
Where : Mossautal/Odenwald – Germany
Line : System 850
Partner : Nau Großküchentechnik

Hotel Zentlinde was set up in 1830 as a small village bar. Later, around 1950, the structure was extended to become a small guest house, ultimately becoming one of the largest and best known hotel structures in Odenwald (Morsbach valley) and the surrounding area.
Whether travelling for work or pleasure, everyone admires the warm and relaxing atmosphere of the hotel which welcomes its guests in modern spaces enjoying every comfort.
Both in the à la carte restaurant with 100 covers and in the Kupferlounge bistro, chef Markus Strein delights his guests with regional and international culinary specialities. All dishes are prepared with an eye to freshness, lightness and creativity, accompanied by a choice of wines from the extensive wine list.

The requirement
Owners Hartmut and Margit Strein, third-generation managers of the hotel, wanted to renovate and expand the existing kitchen.
Hartmut and chef Markus were looking for a solution which guarantees greater efficiency in managing day-to-day work. A top-quality kitchen with gas-powered equipment, like the previous one.

The solution

  • After having visited together the Ambach kitchen in the Hotel Contel in Koblenz, designed by the company Nau Großküchentechnik, the two decided to opt for the Ambach System 850 line, impressed by the high flexibility and ruggedness of the structure.
  • Nau Großküchentechnik supervised the entire restyling project for the kitchen, installing two large cooking islands, one in front of the other.
  • Thanks to the frame architecture of the System 850 line and the Ambach joining system, the island could be transported easily through the various doors to be passed through before arriving at the kitchen. “Particularly in the case of complex transport routes and small kitchens, the high modularity and flexibility of Ambach equipment is a decisive advantage on the market”, commented Andreas Körner, CEO of Nau Großküchentechnik.
  • In order to ensure greater flexibility and facilitate the possible replacement of the equipment when faced with new menu requirements in the future, the cooking modules are connected on each side of both islands via the
    Ambach Joining System.
  • Everyone, from the chef with his team, declared themselves to be extremely satisfied with the choice. “All the equipment works perfectly. We can count on preparation speed and high performances”. And more. The Ambach cooking islands were found to be an optimal choice also in terms of hygiene and cleanliness. “Both islands can be cleaned very fast thanks to the smooth surfaces, rounded edges and neutral bases in H3 steel. This is a considerably important advantage, given the size of the kitchen”, commented the chef and the kitchen team.
  • The joint project between Nau Großküchentechnik and Ambach also worked impeccably with the utmost synergy.

HOTEL WINKLER

HOTEL WINKLER

Project : Hotel Winkler
Category : Hotel
Where : St. Lorenzen – Italy
Line : System 850
Partner : Niederbacher

The name Winklerhotels embodies exclusivity and premium quality for an unforgettable stay in the splendid setting between the Val Pusteria, the Dolomites and Plan de Corones. In the four hotels that make up the Group Winklerhotels offers relaxation, sport and well-being for all ages and all tastes.
Moreover, every stay is also a journey of discovery of alpine and Mediterranean dishes from gourmet Alto Adige cuisine based on a careful selection of the raw materials and use of local products of excellence.

The requirement

  • Around one year ago, in June 2017, the Hotel Winkler was reopened in San Lorenzo di Sebato, one of the structures owned by the family of the same name which heads the company Winkler Hotels GmbH.
  • The hotel has renovated the entire kitchen with cutting-edge equipment to offer increasingly high quality.
  • For such a significant renovation it was essential to choose a partner who offered an all-round service design of a made to measure kitchen, but also creation of a buffet area and supply of all the refrigeration equipment.
  • Preserving the existing but also daring to do something new. The Hotel Winkler project presented the challenge of achieving an optimal balance between tradition, innovation, and quality.


The solution

  • The Winkler family decided to count on invaluable assistance from Niederbacher, lead company in the area of gastronomic outfitting in Alto Adige to meet the challenge.
  • For the main cooking equipment Niederbacher proposed the Ambach System 850 line which was chosen for its modular line, high degree of flexibility and guarantee of high performance.
  • The design of made-to-measure solutions both for the cooking zone and the refrigeration area enabled optimal use of the entire space available. This was made possible thanks to careful planning and preparation of the work upstream, consisting of painstaking every detail of the project.
  • The work was carried out in a total of seven months, while handover and installation of the Ambach cooking island took place and all the items of equipment for the refrigeration area were made available in only four weeks.
  • The end result is the creation of one of the most innovative and leading-edge catering structures in Trentino Alto Adige.
  • All this was carried out without hitches thanks to the excellent organisation, planning and synergy between the client and the firms of architects Bauart AG and Archifaktur, alongside the team from Niederbacher.

HOTEL& RESTAURANT RIZZELLI

HOTEL & RESTAURANT

RIZZELLI

Project : Hotel & Restaurant Rizzelli
Category : Hotel & Restaurant
Where : Neustadt/Aisch – Germany
Line : System 850

Distinctive, and thus unique. These words well describe Hotel & Restaurant Rizzelli, in Neustadt an der Aisch, Germany. This small but exquisite hotel, which has been run for over a half century by the Rizzelli family, is not just for business people, but also for tourists and families, especially at the weekend.
The owners, Marco and his wife Janin Meinl-Rizzelli, are known for their Mediterranean-inspired cuisine, which can be enjoyed à la carte in their restaurant, with bar and lounge.

The requirements

  • In order to work more efficiently and provide smooth service for up to 130 guests, the owners decided to expand and modernise the kitchen with a new cooking unit.
  • The Rizzellis entrusted GGV Gastro Geräte Verkauf & Verleih with all the design, planning and execution of the works. “We already knew GGV, who provided all the technical support for our previous kitchen, so we called the managing director, Gerhard Schmidt, and told him exactly what we had in mind”, says Marco Rizzelli.
  • Rizzelli had a very clear idea of the type of cooking technology he wanted: a gas cooking unit. “I went over everything in detail with GGV, from the individual elements to the entire unit.”

The solution

  • GGV followed every stage of the design and execution of the project, from the enlargement and renovation of the restaurant, through to the reorganisation and optimisation of the kitchen.
  • The company suggested the System 850 from Ambach, opting for a unit of the very highest quality, extremely robust and easy to clean.
  • In just two weeks, the old cooking unit was replaced by the new Ambach suite mounted on a stainless steel base, utilising both gas and electric systems. “The operational requirements of the kitchen made this combination essential”, explains Gerhard Schmidt, managing director of GGV.
  • The new unit includes eight gas burners, a glass-ceramic cooktop, a pasta cooker, a steak grill, and a deep fryer. Upon Marco Rizzelli’s request, Ambach were able to incorporate an existing cooking element into the hygienic top.
  • Both sides of the unit were fitted with H3 open lower cabinets, refrigerated drawers, dish-racks, and two folding side tables for extra space. “Now we can put away our electric kitchen appliances when not in use and keep the food refrigerated, ready for use when we require during preparations”, explained Rizzelli.
  • The owners say they are very satisfied with the choice of Ambach. “Faster and more efficient, with better workflow in the kitchen. Just two days after installation, we could already see a remarkable improvement in service and food quality, which convinced us even further that we’d made the right choice,” says Rizzelli.
  • And the collaboration was all plain sailing: “GGV and Ambach were extremely professional and they were with us all the way, throughout the entire project”, concludes Rizzelli.