ROSEWOOD

ROSEWOOD

Project : Rosewood
Category : Hotel
Where : Beijing, China
Line : Ambach Chef 850
Partner : CKP Hospitality

The Beijing Rosewood is the first hotel in the Rosewood Hotels & Resorts® chain to open in China.

Located in the heart of the lively Asian capital, Rosewood is a five-star boutique hotel which reflects the dynamic cosmopolitan atmosphere in the city.

Tradition and modernity are skilfully blended in the Rosewood to create a hotel that offers a unique experience during your stay: a place to enjoy every aspect of luxury. At the same time, the delicacies served by the six hotel restaurants allow for an unprecedented culinary experience as well as the discovery of authentic and exclusive flavours.

The Assignment

  • To meet guests’ needs in the best possible way, the hotel required a kitchen able to combine the best of Asian and Western traditions while ensuring the highest levels of quality and flexibility.
  • The Rosewood restaurants are among the best in Beijing. For this reason the hotel sought out a partner able to offer products of impeccable quality. The standards to be maintained were high and the choice did not allow for mistakes.

The Solution

  • After careful analysis the choice by Rosewood fell on Ambach, the partner most suited to meeting the hotel’s expectations.
  • Four blocks of the Chef 850 line were installed, a perfect union of flexibility, versatility and innovation.
  • The kitchen is made up of 4 islands with a single hygienic surface and specialist machines inserted in the ranges to prepare local dishes, such as the gas wok and the dim sum steamers.
  • There was a critical area to be tackled. Two cooking islands longer than five metres had to be installed on the second floor of the hotel and needed to be transported by lift. The parts therefore had to be sent to the hotel and to be assembled and welded directly on site.
  • The project was developed over a period of four years together with the design studio CKP Hospitality of Kuala Lumpur and Ali China, the Ali Group contract company for the Asian market.
  • CKP chose Ambach not only for the undisputed quality of the appliances but also for its high flexibility and collaborative approach.
  • Great satisfaction for all those involved: Ambach succeeded once again to meet all the requests by CKP and Rosewood in absolutely the best possible way.

L’OSTERIA

L’OSTERIA

Project : L’Osteria
Category : Restaurant
Where : Innsbruck, Austria
Line : Ambach Chef 850
Partner : MC Gastronomieplanung  and Großküchentechnik

The ‘L’Osteria’ restaurant chain brings the classic flavours of Italian cuisine to Austria and Germany.
With several restaurants in each country, the premises are designed around the style of the classic Italian osteria. Diners can enjoy a range of delicious meals and fragrant pizzas served in an informal and relaxed atmosphere.

The kitchens in l’Osteria’s restaurants in Vienna and Innsbruck were supplied by Ambach.   In Vienna,  kitchens are planned for the new location.

L’Osteria’s premises in Innsbruck are located in the heart of the city where the restaurant can seat up to 250 and has an open kitchen that allows clients to watch the chef and kitchen staff as they prepare the dishes.

 

The request

  • The Innsbruck l’Osteria restaurant needed sturdy hard wearing units that are built to last.
  • Great performance was a priority too, given that the restaurant serves around 2000 meals/day.
  • For L’Osteria, it is very important to have a partner with whom they have open and cordial communication.
  • Before a choice could be made all the appliances had to pass a rigorous test procedure.
  • Ambach allows potential clients to test the kitchens at their showroom at the headquarters in Caldaro, Italy.

 

The solution

  • L’Osteria chose the Ambach Chef 850 line, which combines full modular design with extreme flexibility.
  • The key factors behind the choice were the unbeatable quality of the equipment and the invaluable consultancy service.
  • Together with partners MC Gastronomieplanung e Großküchentechnik, Ambach made an in-depth study of the technical needs of the restaurant to be able to propose the ideal solution.
  • It was decided to install an induction unit with a one-piece hygienic top: a solution that guarantees efficiency, energy economy and impeccable hygiene levels.
  • The addition of a pasta cooker and grill meant that l’Osteria would be able to prepare orders quickly and with consistently perfect cooking results. 
  • Thanks to the removable hygienic top H3, maintenance and cleaning is quick and easy.
  • All the work was carried out in the contractually agreed times to the full satisfaction of all parties involved.
  • The consulting company MC Gastronomieplanung and Großküchentechnikfollowed all phases of the design, planning and installation of the kitchen.

OLD PARSONAGE HOTEL

OLD PARSONAGE HOTEL

Project: Old Parsonage
Category: Hotel
Where: Oxford, UK
Line: Ambach Chef 850
Design consultant: SeftonHornWinch

Ranked as the best hotel in Oxford, the 17th century Old Parsonage is situated in the heart of this historic city at the end of the beautiful boulevard St Giles. It is a couple of minutes’ walk from the Ashmolean & surrounded by some of Oxford’s best restaurants & bars.
The recent refurbishment has seen the addition of a specially curated first floor library with terrace. The new-look restaurant, bar & Pike Room, retain their intimate, bohemian, clubby atmosphere, serving British classic dishes with a light, modern touch. The restaurant & terrace are open all day, enjoy our famous afternoon teas in the company of Oxford’s academic & literary elite.


The Brief

  • To create a state of the art kitchen and new bar.
  • Consultants SeftonHornWinch, Head Chef Steve Smith and his team use the best produce, cooked  simply to create classic British dishes with a modern, light touch.
  • A new pastry section guarantees  the Parsonage will remain the place to have afternoon tea in Oxford.
  • Due to the small size of the kitchen a compact electric kitchen was best needed including new technologies from induction cooking.

The Solution

  • Ambach recommended Chef 850 due to its unique joining system for the ease of changing over new equipment as volumes increase.
  • Due to the size and potential heat that could be caused by gas appliances Ambach recommended Chef 850 Induction ranges.
  • Using induction will create a much cooler kitchen
  • The Ambach cooking suite met the requirements and helped to improve productivity and efficiency,  they  have also seen gains in performance and our ability to guarantee the delivery of excellent food  quality has been optimised.

RITZ CARLTON

RITZ CARLTON

Project : Ritz Carlton
Category : Hotel
Where : Almaty, Kazakistan
Series : Ambach System 900 + System 700 + Chef 850
Partner : Makpa

This luxury 5-star hotel is located on the foot of Alatau Mountains in Almaty and features a spa centre, an indoor pool and a fitness centre. The hotel is part of one of the most prestigious hotel chains in the world with the highest quality standards


The Brief

  • 6 new cooking suites and 3 of them are show kitchens
  • Robustness , hygiene, performance, energy savings and flexibility in the execution of the cooking suites
  • As the kitchen is open plan every detail had to be considered and fine tuned to provide complete functionality and match the locations aesthetics.

The Solution

  • In view of the different types of cooking suites were made with 3 different Ambach ranges System 900 , System 700 and CHEF 850.
  • All show kitchens have a one piece hygienic top and decorated with our Exclusive Execution ( colored panels , stainless steel knobs , steel frames , etc. )
  • In the cooking suites have been integrated with great flexibility , even specific machines for the “ Asian” area such as dim sum steamer and cold dishes
  • Numerous cooking suites were performed with our “plug & play” a box that integrates into the cooking suite all connections at a single point 
  • For better logistics all the blocks were made with joints welding which allowed to take the service elevator to the kitchens also on the upper floors of the hotel

CERESIO 7

CERESIO 7

Project: Ceresio 7
Category: Restaurant
Where: Milan, Italy
Series: Chef 850
Partner: Kent

Milan has a new gourmet address: Ceresio 7. This new chic and casual restaurant recently opened on the roof top of the prestigious Dsquared palazzo building is directed by the ex-chef of the Bulgari hotel Elio Sironi, a lover of simple cuisine made from high quality ingredients. Over looking much of Milan electrifying old and new architecture, Ceresio 7 is a location where a mix of stunning culinary artistry and electrifying views are guaranteed.

The Brief

  • In the restaurant where chef Sironi offers a varied and refined menu and a guarantee that each and every dish is of the highest quality, he needs to count on a reliable and high performing kitchen.
  • The restaurant kitchen is located on a rooftop which has a relatively small footprint and provided reduced accessibility.
  • The location manager requested that the facility be energy efficient.

The Solution

  • Ambach proposes the Chef 850 series, that is compact and allows for freedom of movement and excellent workflow in the kitchen. Ambach proposed the powerful and compact Chef 850 series that allows for freedom of movement and excellent kitchen workflow.
  • The modularity of Chef 850 enabled easy transportation, with individual units delivered to the location and installed into a single block on site.
  • The unique seamless, joint-less system means that the cooking range offers excellent levels of hygiene.
  • The kitchen was designed and manufactured to reduce energy costs to a minimum.

TELFORD COLLEGE

TELFORD COLLEGE

In May 2013 GLS Foodservice Designs were appointed by Telford College of Arts and Technology to design their training facilities in the new Hospitality Suite. The focus of the building and facilities was to have the most effective and high quality teaching and learning environment that reflects a realistic working kitchen and restaurant.

The facilities comprise of two training kitchens and bar area. Training kitchen 1 is a restaurant style for level 2 & 3 students giving the experience of a commercial kitchen environment and operation whilst having a lecturer and student work stations for the provision of teaching 20 students.

Training kitchen 2 for level 1 & 2 students comprising of a lecturer station and island student work stations having their own preparation and cooking facilities, one of the work stations being also suitable for wheelchair students, having a hydro lift system to raise and lower each section.

Each kitchen caters for a central restaurant area, with kitchen 1 offering additionally function and silver service. An order was placed for GLS to supply and install the kitchen and bar equipment in August 2013 with a project programme to complete by the first week in November 2013, after half term. Working closely with all the various contractors following the issuing of our M & E and elevation drawings the kitchens and bar were installed within the three weeks allocated in the programme and the project handover was as scheduled with the facility operational the first week in November 2013.

Consultants & Equipment suppliers

GLS Foodservice Designs Ltd